To the Tagawa-shi synthesis top

About 2020 Tagawa-shi house reform construction subsidy system

The last update date:
    

Purpose of reform system

  When house constructs house reform by construction supplier in the city in city to let maintenance and regional economy of citizen's comfortable living environment activate,

  We assist some expenses.

  As for the reform flyer, please see this.

   

About requirements of construction supplier

Reform supplier
 When supplier who met any of the following requirements in suppliers in Tagawa-shi constructs construction targeted for subsidy
 It is limited. 
  ・It was enrolled in competitive bidding participation qualified person list of Tagawa-shi

  ・It was enrolled in small repair contract applicant list of Tagawa-shi

  ・We have construction industry permit which the Minister of Land, Infrastructure and Transport issues

  ・We have construction industry permit which Governor of Fukuoka issues

 

  ※ Is it enrolled in small repair contract applicant list competitive bidding participation qualified person list?

    You click lower list, and please confirm.

     Various company lists (after the click, we move to the other page.)We open with the other window

 

  

Application reception desk period, window

  Period From April 1, 2020 to March 31, 2021 (from 8:30 a.m. except Saturdays, Sundays and holidays to 5:00 p.m.)

      ※But, by March 31, it is necessary to finish all "completion of construction" and "submission of required document".  

      When it reached the amount of budget (5 million yen), we close receptionist at that point.

   

  Window: Person in charge of city hall Main Building 2 stories house section housing policy ☎0947-85-7152 (direct) old

 

The reception desk situation (as of August 4, 2020)                                                                         

 Budget of this year

The number of receptionists

Sum of subsidy decision finished 

Receivable sum (the remainder of budget)

5 million yen

Nine cases

1.475 million yen

3.525 million yen

                  

                                                                

Sum of subsidy

  10% of expenses (except consumption tax) targeted for subsidy in reform construction costs (less than 1,000 yen cutting off)

  But subsidy sets a ceiling of 200,000 yen.

  Example) reform construction cost 1.5 million yen *10% = subsidy 150,000 yen

    Reform construction cost 2.5 million yen *10% = subsidy 200,000 yen (even if we exceed 200,000 yen in calculation as for the subsidy to 200,000 yen)

 

  ※When we receive other house repair subsidies (grant), sum except construction cost that became a target is targeted for assistance.

Main requirements of grant eligible people 

 ・There is resident registration in the city. Or being going to move into in our city.
 ・In fact, it is owner of house and living in the house concerned. Or what we are going to live in within three months after construction completion.
 ・There not being municipality tax delinquency living in all the households now.
 ・Use supplier in Tagawa-shi.
 ・Not having received grant of subsidy of the system concerned for the past less than five years.
 ・Not having received grant of subsidy of the system concerned by construction of the same contents in the past.
 ・Do not be gangster prescribed in law (1991 law No. 77) Article 2 No. 6 about prevention of unfair act by gangster.
 
 

Supporting target repair work

 ○Construction costs (except consumption tax) being 100,000 yen or more by construction that supplier (there are requirements) in Tagawa-shi undertakes.
 ○Being construction that construction is completed by March 31, 2021 and can submit completion notice to.

 (we shall give priority to other house assistance systems, and, in that case, house repair construction cost except construction cost that became targeted for assistance to system concerned applies to cases 100,000 yen or more.)                                                                                  ○In construction suppliers in Tagawa-shi, it is limited to applicable supplier more than one either among the next important matters.

  ・It was enrolled in competitive bidding participation qualified person list of Tagawa-shi

  ・It was enrolled in small repair contract applicant list of Tagawa-shi

  ・We have construction industry permit which the Minister of Land, Infrastructure and Transport issues

  ・We have construction industry permit which Governor of Fukuoka issues
  Before start of construction (blue)

 

Main example of target construction

 ♦Barrier-free repair work ... step cancellation construction, handrail installation construction such as stairs, corridor, restroom

 ♦Energy saving change construction to repair work ... wall, floor, insulation material setting construction to ceilings, double sash or pair glass

 ♦Durability performance repair work ... roof and exterior painting, wall, floor, ceiling repair work

 ♦Fixed reinforcement construction of reinforcement, strut, pillar and acupuncture, base of earthquake-resistant repair work ... basics part

 

 ※For more details, you inquire, or please see other "lists of target construction".

  

Main example of construction not to be for

 ♦Hot water supply device, toilet, kitchen, construction only for exchange of tatami mat

 ♦Outward appearance construction such as the gate, wall, garage

  

Flow until subsidy grant

 Rough flows until subsidy grant are as follows.

 

 Flow of procedure

  

Style, documents which are necessary by application from grant

 Documents (before beginning construction) necessary for application

 ○   Application documents check seat We open with the other window(PDF: 55.1 kilobytes)

 1. House repair work subsidy grant application (the style first) (word: 25.7 kilobytes)

 2. Resident's card (thing which all the same households are listed in) of applicant ※When we live in the suburbs in people planning residence, we exempt

 3. Proof (for all the same household) without tax delinquency in municipality living now

 4. Documents (thing understanding owner and address of house including fixed assets evaluation certificate) which clarify owner of house

 5. Construction quotation (thing which understands the details if possible)

 6. Construction drawing

 7. Position figure of article

 8. Is going to undertake construction; photograph (pasting up mount) of point (word: 139 kilobytes) ※It is around 2-3 pieces in each construction point

 9. Domiciliation written oath We open with the other window(PDF: 29.9 kilobytes)

 10. Questionnaire We open with the other window(PDF: 67.8 kilobytes)


 

 

 Time ... which changes construction after ... grant decision

 When change of the construction price occurs by addition, reduction of construction point in the middle of construction, after the grant decision, please do change application by all means.
 ※In the case of change, addition of construction point, please photograph without forgetting photograph before construction of the point.

 

  Necessary documents are as follows.  

 1. House repair work subsidy grant change application (style No. 3) (word: 19.8 kilobytes)

 2. Construction quotation after change

 3. Drawing which construction point after change and summary understand

 

 

 Time ... which cancels construction after ... grant decision

 When you cancel construction by some kind of circumstances after the grant decision, please do cancellation application by all means.

 Necessary documents are as follows.

 1. House repair work subsidy grant change application (style No. 3) (word: 19.8 kilobytes)

 

 Documents (procedure after repair work was completed) necessary for completion report

 1. House repair work results report (style No. 5) (word: 23.2 kilobytes)

 2. House repair work completion certificate (style No. 6) (word: 19.3 kilobytes)

 3. House repair work subsidy bill (style No. 8) (word: 20.4 kilobytes)

 4. Receipt (even as for copying, possible)

 5. Construction photograph (pasting up mount) (word: 139 kilobytes)

 6. In the case of person planning residence, applicant is copy of moving or resident's card after having moved into

 

 ※ The submission deadline such as construction results reports is Tuesday, March 31, 2020.

   When you are not in time for the deadline, please be careful as you cannot receive subsidy.

  

List of applications

 House repair work subsidy grant application (the style first) (word: 25.7 kilobytes)

 House repair work subsidy grant application (the style first) entry example (PDF: 58.1 kilobytes)

 House repair work subsidy grant change application (style No. 3) (word: 19.8 kilobytes)

 House repair work subsidy grant change application (style No. 3) entry example (PDF: 39.8 kilobytes)

 House repair work results report (style No. 5) (word: 23.2 kilobytes)

 House repair work results report (style No. 5) entry example (PDF: 34.6 kilobytes)

 House repair work completion certificate (style No. 6) (word: 19.3 kilobytes)

 House repair work completion certificate (style No. 6) entry example (PDF: 29.2 kilobytes)

 House repair work subsidy bill (style No. 8) (word: 20.4 kilobytes)

 House repair work subsidy bill (style No. 8) entry example (PDF: 41.1 kilobytes)

  Domiciliation written oath We open with the other window(PDF: 29.9 kilobytes)

 Photograph pasting up mount (word: 139 kilobytes)

  Questionnaire We open with the other window(PDF: 67.8 kilobytes)


  

Others

  We receive grant of subsidy by false application, other illegal acts and cancel grant decision when we are going to receive,

 When subsidy has been already paid, we may have you return.

  City may ask for documents which other mayors including information about construction contents need as needed.

 

 ○ Tagawa-shi house repair work subsidy grant summary We open with the other window(PDF: 130 kilobytes)

 * List of target construction (PDF: 42.6 kilobytes)

 * Q&A We open with the other window(PDF: 83.7 kilobytes)


 

 

Notice

  Because the city financial institution waits, and they cooperate with Tagawa-shi in various approaches of people, work construction (local construction) from October through November in 2016,

 We concluded inclusion cooperation agreement. As one of the measures for emigration, domiciliation promotion in cooperation cooperation item of inclusion cooperation agreement this by this conclusion,

 Interest rate of "home loan" (the purchase, house repair of new construction, house) that Tagawa citizens use is treated well.  

 

Inclusion cooperation agreementWe open with the other window

 

 


 

We relate to this page
Inquiry
(ID: 2215)
Tagawa-shi government office
〒825-8501  1-1, Chuomachi, Tagawa-shi, Fukuoka   Tel: 0947-44-2000 (main)   Fax: 0947-46-0124  
[open agency time] From 8:30 a.m. to 5:00 p.m. (except Saturdays, Sundays and holidays, New Year holidays)
※Only citizen's section window (various certificate issuance) extends every Thursday at time until 7:00 p.m.
Copyright (C) City of Tagawa

Tagawa-shi government office

〒825-8501
1-1, Chuomachi, Tagawa-shi, Fukuoka
Tel: 0947-44-2000 (main)
Copyright (C) City of Tagawa